Science Lab Equipment Manufacturer

Select Language

en English

            About

,

Francis Turbine Test Rig

    Experiment:
    • To study the operation of a Francis Turbine
    • To determine the Output Power of Francis Turbine
    • To determine the Turbine Efficiency
    Utilities Required:
    • Water Supply and Drain
    • Electricity 15 kW, 440V AC, Three Phase
    • Floor Area 1.5 x 0.75 m

    Reviews

    There are no reviews yet.

    Be the first to review “Francis Turbine Test Rig”

    Your email address will not be published. Required fields are marked *